
Add to Cart
1. Overview
A well water drill rig is specialized equipment used to bore holes into the ground to access groundwater for residential, agricultural, industrial, or geothermal purposes. These rigs vary in design and capability to suit different terrains and project requirements.
2. Advantages
Fit Type | Commonly used brands | Internationally renowned brands | Technical Parameter |
Drill pipe | Baosteel, Tianjin Steel Pipe | Tenaris,Vallourec | Tenaris' TMK drill pipe has a tensile strength of 155ksi |
Bit | Jiangzuan, Chuanshi | Schlumberger | Schlumberger PDC drill bit has a lifespan of up to 2000 hours |
Bushing | Angang Steel Pipe, Huayou Steel Pipe | TMK,Nippon Steel | Nippon Steel's SM series improves corrosion resistance by 40% |
4. Types of Drill Rigs
By Drilling Method:
Cable Tool (Percussion): Simple, cost-effective, ideal for shallow wells.
Rotary Drilling: High-speed, suitable for hard rock formations.
Reverse Circulation (RC): Efficient for deep, large-diameter wells.
Auger Drilling: Best for soft soils; uses helical screws to lift cuttings.
Brand engine has good noise reduction effect
Yuchai/Weichai/Cummins are optional, and each engine undergoes rigorous testing to simulate the noise performance under various complex working conditions before leaving the factory, greatly reducing operational errors caused by noise interference and improving construction efficiency and safety.
SL400S WTAER DRILL RIG DETAILS
Technical parameters | SL330S | SL400S | SL500S | SL650S |
Max drilling depth(M) | 330 | 400 | 500 | 650 |
Drilling diameter(mm) | 105-305 | 105-325 | 105-400 | 105-450 |
Air pressure(Mpa) | 1.2-3.5 | 1.2-3.5 | 1.2-3.5 | 1.6-6 |
Air consumption(mm³/min) | 16-55 | 16-55 | 16-55 | 16-75 |
Drill pipe length(m) | 7 | 7 | 7 | 6 |
Drill pipe diameter(mm) | 89 | 89/102 | 102 | 89/102 |
Axial pressure(T) | 3 | 4 | 6 | 6 |
Lifting force(T) | 18 | 22 | 30 | 38 |
Fast lifting speed(m/min) | 30 | 29 | 29 | 28 |
Fast feeding speed(m/min) | 60 | 56 | 48 | 60 |
Max rotary torque(Nm) | 8000/4000 | 8000/4000 | 11000/5500 | 13000/6500 |
15000/7500 | ||||
Max rotary speed(r/min) | 60/120 | 75/150 | 75/150 | 95/190 |
Big secondary winch lifting force(T) | - | - | - | Can be added 5 tons |
Small secondary winch lifting force(T) | 1.5 | 1.5 | 1.5 | 2.5 |
Jacks stroke(m) | 1.6 | 1.6 | 1.6 | 1.6 |
Drilling efficiency(m/h) | 10-35 | 10-35 | 10-35 | 10-35 |
Moving speed(km/h) | 2.5 | 2.5 | 3 | 3 |
Uphill angle(Slope) | 21° | 21° | 21° | 21° |
Weight of the rig(T) | 8.3 | 9.8 | 10.6 | 13 |
Dimension(M) | 6.32*1.7*2.39 | 6.26*1.85*2.43 | 6.52*1.85*2.51 | 6.73*2.1*2.75 |
Belt and chain adjustment: Regularly check the tightness of the drive belt and chain, adjust them in a timely manner to avoid slipping or excessive wear. Record adjustment parameters for future maintenance reference
Component cleaning frequency: Regularly clean the radiator and cooling system to prevent dust from clogging. Clean the air filter and keep the intake air unobstructed. Clean the surface of drilling tools, frames, and other components to reduce corrosion.
Filter replacement cycle
Regularly replace hydraulic oil and fuel filters according to the working environment and frequency of use. It is generally recommended to replace the oil every 200 hours of operation to maintain cleanliness and extend the lifespan of the equipment.
Lubrication requirements
According to the equipment manual requirements, regularly add designated lubricating oil to each lubrication point. Focus on lubricating high load parts such as transmission shafts and bearings to ensure sufficient lubrication and reduce friction losses. Record lubrication time and amount for tracking lubrication effectiveness
Daily insapection points
Check the appearance of the drilling rig for damage or abnormal wear, ensuring that all fasteners are not loose. Check if the electrical system connections are good and if the cables are not damaged. Verify the oil level observation of the hydraulic system for any signs of leakage. Monitor the engine running sound to ensure there is no abnormal noise. Check the wear and tear of drill rods, drills, and other tools, and replace damaged parts in a timely manner.
Quarterly excessive items: Conduct an unboxing inspection of the gearbox and gearbox, and replace worn parts. Check and replace aging seals to prevent leakage. Verify instruments and sensors to ensure accurate data.
Annual comprehensive maintenance: Conduct a comprehensive disassembly inspection, cleaning, inspecting, repairing, or replacing all components. Perform non-destructive testing on key components to prevent hidden faults. Update maintenance records and specify the maintenance plan for the next year.
Monthly maintenance tasks
Thoroughly inspect the electrical system and test whether all functions are normal. Check and adjust the hydraulic system pressure to ensure stable operation. Clean the sediment at the bottom of the fuel tank and keep the oil clean.
Component replacement plan
Based on the service life and maintenance records of the components, specify an annual replacement plan. Prioritize the replacement of vulnerable parts and critical components to ensure equipment reliability. Reserve commonly used spare parts to shorten maintenance cycles.
WHO ARE WE?
FAQ:
1. Are you a trading company or a manufacturer?
We are a professional manufacturer. Our factory mainly produces water well drilling rigs, core drilling rigs, down-the-hole drilling rigs, pile drivers, etc. The products have been exported to hundreds of countries around the world and enjoy a high reputation all over the world.
2. How can we guarantee quality?
Always a pre-production sample before mass production;always final inspection is done before shipment;and our main unit has a one-year warranty, during which all damaged accessories can be replaced with new ones. We provide machine installation and operation videos.
3. How to inspect the goods?
1) Support customers to come to the factory for on-site inspection.
2) Support customers to designate third-party companies to inspect goods.
3) Support video inspection.
4. Do you have after-sales service?
Yes, we have a dedicated service team that will provide you with professional technical guidance. If you need, we can send our engineers to your workplace and provide training for your employees.
5. How about quality assurance?
We provide a one-year quality guarantee for the main machine of the machine.
6. How long is your delivery cycle?
1) In the case of stock, we can deliver the machine within 7 days.
2) Under standard production, we can deliver the machine within 15-20 days.
3) In the case of customization, we can deliver the machine within 20-25 days.
7.Can you do OEM for me?
We accept all OEM orders,just contact us and give me your design.we will offer you a reasonable price and make samples for you ASAP.